Most developers do fix snags. The difference between snags fixed in two weeks and snags still open in six months is usually how they were reported.
1. Send one clear report, not lots of messages
Put every snag into one list, grouped by room. For each item include:
- The room and exact location ("bedroom 2, wall left of the window, 1 m from the floor")
- What's wrong, in plain words
- A clear photo
- A reference number, so you can both talk about "item 14"
A tidy report is easy for the site team to turn into a job list. A stream of WhatsApp messages is not.
2. Use the developer's official channel
Most developers have a customer care email address or an online portal. Use it, even if the site manager is friendly. It creates a dated record, and it's what an ombudsman or warranty provider will look at later.
3. Ask for a date
At the end of your report, ask the developer to confirm when they will inspect and when the work will be done. A polite "please confirm a date for these repairs within 7 days" works better than an open-ended request.
4. Be available for access
Repairs need someone at home. Offer a few dates. If you can't be in, ask whether they can work on a list of items with a key holder.
5. Check and sign off each item
When the trades have been, check every item before you agree it's done. Update your list: fixed, partly fixed, not fixed. Send the updated list back, with new photos for anything still open.
6. Escalate calmly, in writing
If nothing happens:
- Chase after the date you were promised, quoting your original report
- Ask for the customer care manager, not just the site team
- Keep it factual and polite. You may need these emails later
If the developer still doesn't act, see when the developer won't fix it for your options, including the New Homes Ombudsman Service.