What is snagging, and why every new build needs it

Snagging means finding and listing the defects in a new-build home so the developer fixes them. Here is what it covers, when to do it and why it matters.

A snag is anything in a new home that is unfinished, damaged or not built properly. Snagging is the job of finding those problems, writing them down and sending the list to your developer so they put them right.

Almost every new build has snags. Most are small: a door that sticks, paint on a window, a missing piece of sealant. Some are bigger: a radiator that never gets warm, a leaking waste pipe, a patio that drains towards the house. A typical home has dozens.

Why snags happen

New homes are built quickly, by many different trades, often to a tight deadline before handover. The plasterer, the electrician, the kitchen fitter and the decorator each finish their part and move on. Small things get missed, and nobody walks the whole house with fresh eyes. That is your job as the buyer.

What snagging covers

A proper snag check goes room by room and looks at:

  • Walls and ceilings: cracks, bumps, poor paint, marks
  • Doors and windows: do they open, close and lock properly, are seals and glass intact
  • Floors: gaps, squeaks, damaged boards or tiles, uneven surfaces
  • Kitchen and bathrooms: sealant, tiling, taps, drainage, extractor fans
  • Heating and electrics: every radiator, socket, switch and light
  • Outside: brickwork, mortar, gutters, paving, fences, drainage

It is not a structural survey. You are looking for defects you can see and test, not checking the foundations.

Why it matters

Your developer is responsible for fixing defects in the first two years under most new-build warranties (see your 2-year builder warranty, explained). But they can only fix what you report, and it is much easier to get a snag fixed when you report it early, in writing, with a photo.

Snags left alone can also get worse. A missing bead of sealant round a shower becomes a leak into the ceiling below. A badly fitted window lets in a draught all winter.

When to snag

The best time is before you legally complete, if your developer allows a pre-completion inspection. If not, snag in your first few days, before furniture hides the floors and walls. We cover the timing in snag before or after you move in?

Who does it

You can pay a professional snagging company, usually £300 to £600, or do it yourself with a good checklist. Doing it yourself is very doable if you are thorough. Our snagging survey vs DIY guide compares the two honestly.