Guides · 2 min read
Snag before or after you move in?
The best time to snag a new build is before legal completion if you can, or in your first days in the home. Here's why timing matters.
Short answer: snag as early as you can. Before completion if your developer lets you in, and otherwise in the first few days, before the furniture arrives.
Option 1: before completion
If your developer is registered with the New Homes Quality Code, it should let you, or someone you appoint, inspect the home before legal completion. Ask your sales adviser or site manager when the home will be ready and book a slot.
Why this is the best time:
- The rooms are empty, so you can see every wall, floor and skirting board
- The trades are often still on site and can fix things quickly
- Any serious problem, such as a home that clearly isn't finished, is something you can raise before you hand over the money
What to watch for: the home may not be fully finished on the day. Note what is incomplete as well as what is faulty, and keep it all in writing.
Option 2: the first days after you get the keys
If a pre-completion inspection is not possible, do your snag check on handover day or as soon after as you can. Again, the key is an empty house. Once sofas, beds and boxes are in, you will miss marks on floors, damaged skirting and cracks behind furniture. And it becomes harder to prove the damage was there before you moved in.
Option 3: after you have lived there a while
Some snags only show up with time: a radiator that never gets hot when it's cold outside, a window that leaks in heavy rain, a crack that opens as the house dries out. So plan a second walk round, around 6 to 12 months in, and another before your two-year builder warranty period ends.
A simple plan
- Before completion: full room-by-room snag check, if allowed
- Handover day: check what you reported was fixed, read the meters, take photos of everything (our handover day guide)
- First month: report anything new as you find it
- Around month 12: second full check, including shrinkage cracks
- Before month 24: final check before the builder period ends