Guides · 2 min read
What to check on handover day
A handover day checklist for new-build buyers: meters, keys, paperwork, a home demonstration and the snags you reported.
Handover day is when you get the keys. It's exciting and rushed, and it's easy to forget the things that matter later. Give yourself at least an hour and take this list.
Before you arrive
- Bring your snag list from any pre-completion inspection
- Charge your phone and bring a torch and a phone charger to test sockets
- Ask the developer to give you a home demonstration of the heating, hot water and any special systems
Meters
Take a dated photo of each meter reading on the day you get the keys:
- Electricity
- Gas, if you have it
- Water
Send the readings to your energy and water suppliers. It stops you being billed for the builders' usage.
Keys and access
- Count the keys for every external door and window
- Check every key works
- Ask for codes for any alarm, bin store or communal door
- Ask who to call for the development's communal areas
Paperwork to ask for
You should receive, or be told how to get:
- The new-home warranty documents
- Building regulations completion certificate
- Energy Performance Certificate (EPC)
- Gas safety and boiler commissioning paperwork (the boiler's Benchmark checklist), if you have gas
- Electrical installation certificate
- Manuals and guarantees for the boiler, appliances and other equipment
- Details of how to report snags (the customer care email or portal)
Re-check your earlier snags
If you snagged before completion, go through the list. Mark each item fixed, partly fixed or not fixed, and take new photos.
A quick snag walk
If you didn't get a pre-completion inspection, this is your moment. The home is empty. Go room by room, test doors, windows, taps, radiators and sockets, and photograph anything wrong. Our snagging checklist covers what people usually miss.
Afterwards
Send your snag list to the developer in writing within the first days, and keep a copy. See how to get your developer to fix snags fast.